---
title: Talon/LPE Named a 2025 ENR Top 600 Specialty Contractor
description: Talon/LPE, ENR 2025, Specialty Contractor, Environmental Remediation, MDPE, Soil Shredding, Injections
---

[Talon LPE - Blog ](https://www.talonlpe.com/blog)

# [Talon/LPE Named a 2025 ENR Top 600 Specialty Contractor](https://www.talonlpe.com/blog/talon/lpe-enrtop600)

 Written by [Talon/LPE](https://www.talonlpe.com/blog/author/talon-lpe-eje) | Nov 18, 2025 4:16:34 PM

Talon/LPE is proud to announce that we have been recognized in **Engineering News-Record’s 2025 Top 600 Specialty Contractors**, ranking **#19 among all environmental firms nationwide** and **#575 overall**.  
See the full list here:  
🔗[ ENR 2025 Top 600 Specialty Contractors](https://www.enr.com/toplists/2025-Top-600-Specialty-Contractors-Preview)

This honor reflects our continued growth, reliable performance, and specialization in complex environmental and remediation projects across the region.

## **Specialized Remediation Services That Set Talon/LPE Apart**

Our ENR recognition highlights the strength of our field teams and our commitment to technical innovation within specialty environmental contracting. Talon/LPE brings advanced remediation capabilities that many firms do not offer in-house, including:

### **• Soil Shredding**

Our mobile soil shredding units process contaminated soils directly on-site, improving remediation efficiency, lowering disposal costs, and supporting faster project turnaround.

### **• Mobile Dual-Phase Extraction (MDPE)**

Talon/LPE’s MDPE systems provide aggressive removal of both contaminated groundwater and vapors. This dual-phase approach allows us to address source areas more rapidly and efficiently, reducing long-term cleanup time and cost.

### **• Injection Services**

We design and execute in-situ injection programs using oxidants, reductants, bioremediation amendments, and specialty reagents. These targeted treatments help break down contaminants in place, restoring subsurface conditions without disruptive excavation.

## **Why Clients Choose Talon/LPE**

Environmental challenges require more than standard solutions — they require expertise, equipment, and the ability to adapt in the field. Clients trust Talon/LPE because we offer:

- **Specialty equipment and mobile remediation systems** designed for rapid deployment
- **Experienced environmental scientists, geologists, and field teams** who understand real-world site conditions
- **Efficient, scalable project execution** that minimizes downtime and disruption
- **Deep regional experience** with regulatory requirements across Texas, New Mexico, Oklahoma, Kansas, and surrounding states

Our ranking in ENR’s Top 600 demonstrates not only capability but consistency — delivering safe, high-quality work across every project.

## **Moving Forward**

This recognition inspires us to continue expanding our remediation technologies, strengthening client partnerships, and raising the bar in specialty environmental contracting.

To everyone on the Talon/LPE team and to our valued clients — **thank you for helping make this achievement possible.**

[View full post](https://www.talonlpe.com/blog/talon/lpe-enrtop600)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Talon/LPE"
  },
  "dateModified" : "2025-11-20T18:39:47.135Z",
  "datePublished" : "2025-11-18T16:16:34Z",
  "headline" : "Talon/LPE Named a 2025 ENR Top 600 Specialty Contractor",
  "image" : {
    "@type" : "ImageObject",
    "height" : 450,
    "url" : "https://458147.fs1.hubspotusercontent-na1.net/hubfs/458147/Banner%20Injections%20ENR.png",
    "width" : 1200
  },
  "mainEntityOfPage" : "https://www.talonlpe.com/blog/talon/lpe-enrtop600",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60,
      "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
      "width" : 60
    },
    "name" : "Talon LPE - Blog"
  }
}
```